Long-Lead Items in Construction: Why They Can Control Your Schedule

A commercial construction schedule can look perfectly reasonable on paper and still run into trouble because of something that won’t be installed for months.

The problem is often procurement.

Certain materials and pieces of equipment require more time to manufacture, approve, ship, or coordinate than owners may expect. Electrical equipment, mechanical units, specialty doors, structural components, elevators, custom finishes, and other project-specific products can all become long-lead items depending on the job and the market conditions at the time they’re ordered.

That doesn’t mean every project will struggle with the same materials. Lead times change, and a product that’s readily available on one job may become a schedule concern on another. The practical lesson is that procurement needs to be treated as part of the construction schedule from the beginning, not as something that happens automatically after the contract is signed.

When a long-lead item is identified early, the team has options. When it’s identified too late, the schedule may already be depending on a delivery date that can’t be met.

What Makes a Construction Item “Long Lead”?

A long-lead item is generally any material, product, or piece of equipment that requires enough time to procure that its delivery could affect the project schedule.

The important part of that definition is the schedule impact.

A product doesn’t need a six-month manufacturing window to cause problems. If a particular item requires eight weeks to arrive but the construction sequence needs it in six, it’s a long-lead concern for that project.

Lead time can also include much more than manufacturing. Before a contractor can release an item for production, there may be shop drawings, product data, design-team review, owner approval, color selections, engineering, field measurements, deposits, or coordination with other trades.

That means the actual procurement timeline may begin well before a purchase order is issued.

For example, a piece of mechanical equipment might need to be selected, reviewed by the engineer, coordinated with electrical requirements, approved through the submittal process, and released to the manufacturer. If the equipment affects roof penetrations, structural framing, controls, power requirements, or other work, several parts of the project may depend on having accurate information even before the unit itself reaches the site.

This is why experienced construction teams don’t look only at the expected delivery date. They work backward from when the project needs the item and ask what has to happen before that date can be achieved.

Long-Lead Items Can Influence Work That Happens Much Earlier

One of the easiest mistakes to make is assuming that an item doesn’t matter until it’s time to install it.

On a commercial jobsite, different scopes are tied together.

An electrical component scheduled for installation late in the project may require information that affects conduit, feeders, equipment pads, room dimensions, or rough-in work much earlier. A storefront system may depend on exact opening dimensions. A piece of owner equipment may require specific plumbing, electrical, structural support, ventilation, or clearances.

If that information isn’t available when the surrounding work needs to proceed, the project team can end up making assumptions or delaying other work.

The problem becomes even more noticeable when an item needs to be installed before another major activity can happen. Equipment may need to be set before walls are closed. A large component may need to enter the building before access becomes limited. Certain materials may need to be in place before inspections or startup can occur.

Those relationships are part of construction sequencing.

A delivery date that slips two weeks doesn’t always cause a two-week project delay. Sometimes the surrounding work can be resequenced and the time can be recovered. In other cases, that one missing item sits directly in the path of several activities that can’t move forward without it.

Understanding the difference is where good scheduling and procurement planning come together.

The Procurement Schedule Starts With the Construction Schedule

A useful procurement schedule isn’t simply a spreadsheet listing products and expected delivery dates. It should connect those items to the actual sequence of construction.

The team first needs to understand when a material or piece of equipment must be available on the jobsite. Then they can work backward through shipping, manufacturing, fabrication, approvals, submittals, and purchasing.

Consider a simplified example.

Suppose a particular piece of equipment needs to arrive on site October 1. Manufacturing and shipping are expected to require 14 weeks. The manufacturer can’t begin until an approved submittal is received, and the submittal itself may take time to prepare, review, revise, and return.

The date that matters is no longer October 1.

The decision and submittal process may need to begin months earlier.

This is one reason procurement conversations during preconstruction can be so valuable. The building may still be in design, but the team can already begin asking which components deserve attention and whether any decisions need to move ahead of the normal sequence.

Owners don’t necessarily need to purchase everything early. They do need to know which decisions can’t afford to wait.

Owner Decisions Are Part of the Lead Time Too

Long-lead discussions tend to focus on manufacturers and supply chains, but owner decisions can be just as important.

A contractor can’t release a custom product if the finish hasn’t been selected. Equipment may remain on hold while the owner evaluates options. A tenant may still be deciding between two layouts that require different mechanical or electrical work. Branding or signage decisions may affect dimensions and power requirements.

None of those situations is unusual. Commercial projects involve many decisions, and owners often have good reasons for taking time to make them.

The schedule simply needs to account for that time.

This is especially important when a selection appears cosmetic but is connected to fabrication. Choosing a finish late on a stock product may have very little consequence. Choosing a finish late on something that’s being custom manufactured can prevent production from starting.

One of the more useful things a construction team can do is distinguish between decisions that can remain open and decisions that are beginning to threaten a procurement date.

That allows the owner to focus attention where it’s actually needed instead of treating every selection as equally urgent.

Early Release Can Help, but It Comes With Tradeoffs

When a major long-lead item threatens the project schedule, one possible strategy is to release it before the rest of the project is fully bought out or before every construction document is complete.

That can make sense, but early purchasing isn’t automatically the right decision.

Releasing an item sooner can protect manufacturing time, yet it can also reduce flexibility. If the design changes after the order is placed, the project may face redesign costs, restocking fees, change charges, or equipment that no longer fits the revised requirements.

The team has to weigh schedule risk against design risk.

How complete is the information? How likely is the equipment specification to change? Are dimensions established? Have utility requirements been confirmed? Does releasing the item lock the owner into decisions that are still being evaluated?

Sometimes the schedule benefit clearly outweighs those concerns. Other times, a few additional weeks of design coordination are worth more than an early purchase order.

Good procurement planning isn’t simply about ordering sooner. It’s about releasing each item when enough information is known to make the decision responsibly.

Substitutions Aren’t Always a Simple Fix

When an expected delivery date becomes a problem, the obvious question is whether the team can use a different product.

Sometimes it can.

A comparable product from another manufacturer may have a shorter lead time, and that substitution can be a practical way to protect the schedule. But “comparable” needs to mean more than roughly the same size or purpose.

Different equipment may have different electrical requirements, efficiencies, dimensions, capacities, controls, warranties, structural needs, or connections. Alternate finishes may look different from the rest of the project. A substitution can require additional design review or affect another trade’s work.

There can also be cost implications.

An available alternative might cost more than the original product but avoid a much larger schedule impact. In that situation, paying more for the item could still be the better overall decision for the project.

That’s the kind of tradeoff owners and project teams need to evaluate in context. The purchase price matters, but so does everything the delivery date touches.

Storage and Early Delivery Create Their Own Questions

There’s another side to long-lead procurement that doesn’t get as much attention: sometimes an item arrives earlier than the jobsite is ready for it.

That sounds like a good problem to have until someone has to determine where the material will go.

Commercial jobsites don’t have unlimited storage. On a tight site, every area used for stored material may affect traffic, equipment access, deliveries, safety, or another subcontractor’s ability to work. Some products also need protection from weather, moisture, dust, heat, theft, or damage.

If equipment arrives months before installation, warranties or storage requirements may need to be considered as well.

A procurement strategy therefore needs to coordinate both ends of the timeline. The team needs the item early enough to protect the schedule, but not so early that the jobsite becomes a warehouse for materials that can’t yet be installed.

On active projects, those details matter. Moving the same material three times because it arrived before there was a place for it creates work without moving the building any closer to completion.

What Owners Should Ask About Long-Lead Items

Owners don’t need to manage procurement themselves, but they should understand where the major schedule exposure exists.

A few questions can make those conversations much more useful:

  • Which materials or equipment currently have the greatest lead-time risk?
  • When do those items need to be released to maintain the schedule?
  • Are any owner selections or design decisions holding up procurement?
  • What other work depends on receiving information from those items?
  • Are there reasonable alternates if the planned product can’t arrive on time?
  • Would early release create additional cost or design risk?

The answers will change as the project develops. That’s normal.

Lead times should be checked again as bids come in, submittals are prepared, manufacturers confirm production dates, and the construction sequence becomes more detailed. Procurement isn’t a one-time conversation at the beginning of the job.

A Good Schedule Looks Beyond What’s Happening on Site Today

Construction schedules naturally draw attention toward visible milestones: excavation starts, concrete is poured, steel goes up, walls are framed, and finishes begin.

Procurement is quieter.

A purchase order may be issued months before anyone on the jobsite sees the item. A submittal can move through several hands while field crews are focused on completely different work. Yet those early decisions can determine whether the project has what it needs when the schedule reaches the installation date.

At Grass Creek Construction, that forward-looking coordination is part of how we think about a commercial project. The question isn’t only what the field needs this week. We also need to understand what the project will need weeks or months from now and whether anything has to happen today to make that possible.

Owners don’t need every material delivered early, and they don’t need to rush every decision. They do need visibility into the few items where waiting has consequences.

When a contractor identifies those items early, connects procurement to the construction schedule, and communicates which decisions are approaching their deadlines, long-lead materials become something the team can manage instead of something everyone discovers after the schedule has already moved.

Tisha Hiatt

Director, Home Office

Tisha brings more than 20 years of experience in effectively overseeing administrative operations. She is known for her attention to detail and excellent communication skills, which ensure smooth day-to-day operations and foster a positive workplace environment. She is a proven leader with a wealth of experience in managing home office operations.

Her skills also include maintaining accurate records, managing accounts payable and receivable, and making sure that financial transactions are processed efficiently and accurately. She is also dedicated to supporting the company’s success through effective HR practices by fostering a positive and inclusive work culture through implantation of company policy and structure.

Dedicated to cultivating a positive and dynamic workplace, Tisha offers unparalleled support to both colleagues and clients, elevating her indispensable role within the executive team.

Britton Long

Area Director, FL

Britton is a seasoned leader in the commercial construction industry, bringing more than 10 years of experience to his role as Area Director. With a proven track record of success in overseeing projects, he excels in driving operational excellence and delivering exceptional results. His strategic vision and collaborative approach ensure that projects are completed on time, within budget, and to the highest standards of quality.

He excels in coordinating teams, managing timelines, and ensuring project goals are met with efficiency and precision. He is dedicated to delivering results that exceed client expectations while maintaining a focus on quality and adherence to budgetary constraints.

Britton’s steadfast dedication to nurturing a culture of innovation and ongoing advancement establishes him as a respected leader within the industry and a cornerstone of our Florida operations.

Jeremy Taggart

Lead Estimator

With 10 years of experience in commercial construction estimating, Jeremy is a seasoned professional known for his meticulous attention to detail and comprehensive understanding of project cost analysis.

As the lead estimator, he plays a pivotal role in guiding the preconstruction phase, leveraging his expertise to accurately assess project requirements and develop competitive bids. He excels in collaborating with project stakeholders to ensure accurate budgeting and forecasting, ultimately contributing to the success of each project.

Jeremy is a vital asset to our executive team, leveraging state-of-the-art estimating software and industry-leading practices to optimize workflows and provide accurate cost estimates. His unwavering dedication to quality and efficiency allows him to consistently surpass project deadlines and exceed client expectations. Jeremy’s exceptional skills not only cultivate strong relationships but also ensure clarity and understanding across all our projects.

Craig Riddle

Director, Business Development

Craig has been in the construction industry for over 37 years and is well versed in the aspects of the construction industry. He is a dynamic leader who possesses a strong track record in building and nurturing relationships with clients and stakeholders. Craig excels in developing tailored solutions to meet client needs and enhance overall business performance.

He possesses a strong track record of identifying and capitalizing on new business opportunities, leveraging his market expertise and innovative approach to expand the organization’s reach and revenue streams.

Craig is dedicated to driving sustainable growth and creating value for the organization through proactive business development initiatives, making him an integral part of the executive team.

KC Peisley

COO

KC is an accomplished and results-driven professional and serves as our Chief Operating Officer (COO). His just under 30 years of experience provides a proven track record in the construction industry and brings a wealth of experience and strategic leadership to the executive team.

As COO, KC is responsible for overseeing the day-to-day operations of the company, ensuring efficiency and excellence in project execution. KC has a keen understanding of construction processes and a commitment to quality.

In addition, KC has a strong background in project management, resource optimization, and risk mitigation. He collaborates closely with the team to streamline workflows, enhance operational performance, and uphold the highest standards of safety and compliance.

KC’s extensive knowledge makes him a very effective leader and he is an integral part of the company’s leadership, contributing to our reputation for delivering outstanding construction projects.

Spence Richins

Founder/CEO

Known for his hands-on approach and dedication to quality, Spence is involved in every phase of a project, from initial concept to final delivery. He places a strong emphasis on collaboration, fostering a company culture that values teamwork, integrity, and a commitment to exceeding client expectations.

With a clear vision for the future, Spence continues to lead Grass Creek towards new horizons, leveraging his expertise to navigate the evolving landscape of commercial construction and drive sustainable growth. This is evidenced by Grass Creek’s recent expansion to Florida in December 2022, where profitable projects are currently underway, as well as more in negotiation, that will continue to add to Grass Creek’s overall profitability.

Since 2014, Spence has played a pivotal role as a silent equity partner at AMC Concrete, based in Las Vegas, Nevada. AMC Concrete is renowned for its expertise in concrete tilt-up projects, and this strategic partnership has enriched Spence’s extensive understanding and proficiency in the construction industry.

Spence’s unwavering commitment is not only reflected in the quality of the delivered projects, but also in the enduring relationships built with clients who have come to rely on his expertise. As a result, Spence’s impact extends beyond individual projects, creating a legacy of trust, quality, and lasting partnerships within the professional landscape.